The Mofet Institute, Tel Aviv
College and offices of Mofet management on a built area of about 7,000 sqm and about 2,000 sqm.
The project included construction of a classroom building, offices, car parks, and an auditorium.
The building includes many electromechanical systems such as: an VRF air conditioning system, a server farm, high voltage, an emergency power plant, sprinkler pumps, facades covered with aluminum sheets, a dry-hanging stone curtain wall and screen walls.
Execution of foundations and sealing the basement proved to be a complex engineering challenge, due to the high groundwater level, about three meters from the bottom of the basement.
Entrepreneur: Mofet Institute
Architect: Speizman Chassel Architects
Supervision: Eichenbaum