The Mofet Institute, Tel Aviv

 College and offices of Mofet management on a built area of about 7,000 sqm and about 2,000 sqm.

The project included construction of a classroom building, offices, car parks, and an auditorium.

The building includes many electromechanical systems such as: an VRF air conditioning system, a server farm, high voltage, an emergency power plant, sprinkler pumps, facades covered with aluminum sheets, a dry-hanging stone curtain wall and screen walls.

Execution of foundations and sealing the basement proved to be a complex engineering challenge, due to the high groundwater level, about three meters from the bottom of the basement.

 

 

Entrepreneur: Mofet Institute

Architect: Speizman Chassel Architects

Supervision: Eichenbaum